Comments on: PlannerX v2.0 goes live – adds estimates, start dates and foundation for future https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/ activeCollab Modules, Training and Consulting that make it more productive and enjoyable! Sat, 14 Dec 2024 20:04:34 +0000 hourly 1 https://wordpress.org/?v=4.2.38 By: Apps Magnet https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-763 Sat, 05 Jun 2010 05:16:54 +0000 https://www.appsmagnet.com/?p=813#comment-763 We don’t have a fixed timeframe on this, but it’s certainly on cards. We actually have most of the pieces in place. The only bottleneck is the amount of API calls required to pull time tracking data and summarize it. Can’t do that all the time, so need to cache this data. We we are working on the best possible caching strategy. Will keep everyone posted! Thanks!

]]>
By: Jeff https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-762 Fri, 04 Jun 2010 20:47:12 +0000 https://www.appsmagnet.com/?p=813#comment-762 Do you have a general time frame when Actual and Estimated hours can be reported on from within PlannerX? That’s the big deal we need.

]]>
By: Apps Magnet https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-756 Wed, 26 May 2010 10:01:12 +0000 https://www.appsmagnet.com/?p=813#comment-756 @Kara: Sorry but there is no direct way to do what you want. What you can do is create a plan using XML import (or text import) and then use Batch Update to “push forward” dates by a few “days / weeks or months” as you need. Try it out, I think it may solve the problem.

]]>
By: Kara https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-755 Tue, 25 May 2010 13:56:25 +0000 https://www.appsmagnet.com/?p=813#comment-755 Hi Their:

Is their a way to add template dates in PlannerX? For example to-do items should be started on the 24th for example and happen weekly after that, or every 3 days, etc?

]]>
By: Apps Magnet https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-714 Mon, 19 Apr 2010 16:25:29 +0000 https://www.appsmagnet.com/?p=813#comment-714 Hi Todd,
OpenID should work with PlannerX. It used to work. I tried to check it now, but Basecamp does not accept my OpenID anymore. You had to use the special OpenID username / password earlier. I could not verify now if it works. Will check back again, but it should work!
:Nirav

]]>
By: todd blackmon https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-713 Mon, 19 Apr 2010 15:59:48 +0000 https://www.appsmagnet.com/?p=813#comment-713 Does this work with open ID?

]]>
By: Apps Magnet https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-678 Sun, 07 Mar 2010 06:48:58 +0000 https://www.appsmagnet.com/?p=813#comment-678 Yes! The bookmarklet (coupled with the improved “remember me” feature) will allow you to work on PlannerX from Basecamp. It will detect which project you are currently on, and will load it directly in PlannerX. You won’t even have to login / logout of PlannerX (if you tick “remember me”).

We plan to release the bookmarklet by 15th March.

]]>
By: Robert https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comment-675 Sat, 06 Mar 2010 20:02:29 +0000 https://www.appsmagnet.com/?p=813#comment-675 Will the new link inside Basecamp allow us to work in multiple projects without having to logout/login between each? We have multiple projects in Basecamp, but PlannerX only supports logging into one project and I do not see any ‘swap’ button to take me to another project. Thanks !

]]>