Apps Magnet » upgrade https://www.appsmagnet.com activeCollab Modules, Training and Consulting that make it more productive and enjoyable! Fri, 06 May 2016 05:28:10 +0000 en-US hourly 1 https://wordpress.org/?v=4.2.38 All our products are activeCollab 2.3.6 compatible now! https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-6-compatible-now/ https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-6-compatible-now/#comments Wed, 16 Nov 2011 07:31:03 +0000 https://www.appsmagnet.com/?p=1722 Wanted to let everyone know that all our products are now compatible with activeCollab 2.3.6.

We updated Confidential Items Module for compatibility, and even added some bug fixes and new features to Tickets Plus. All other modules will work without a change.

Products we’ve updated:

  • Tickets Plus Module (version 1.5.8 – this also adds useful new features and fixes bugs)
  • Confidential Items Module (version 1.3.3)

Latest versions of all other products are already compatible with activeCollab 2.3.6

Tickets Plus 1.5.8 Changelog

Enhancements:

  • activeCollab v2.3.6 compatibility version.
  • Option to include descriptions while printing tickets list

Fixes:

  • Call to undefined method “time_to_float” error. Fixed.

Customers can download these updates from our members area.

Enjoy!

]]>
https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-6-compatible-now/feed/ 0
Updates for five products available – Gravatar, Incremental Backup, Hide People, Tickets Plus and Time Reports Plus https://www.appsmagnet.com/updates-for-five-products-available-gravatar-incremental-backup-hide-people-tickets-plus-and-time-reports-plus/ https://www.appsmagnet.com/updates-for-five-products-available-gravatar-incremental-backup-hide-people-tickets-plus-and-time-reports-plus/#comments Wed, 28 Sep 2011 12:04:10 +0000 https://www.appsmagnet.com/?p=1682 We are glad to announce updates to five products.

You can download these updates from our members area as usual!

Here’s a summary of updates in these versions.

acHack – Gravatar (v1.3.2)

  • activeCollab v2.3.5 compatibility version.

acHack – Incremental Backup (v2.2)

  • Takes database backup of only activeCollab tables.
  • Fixed: (Backup returned these errors: Array) email notification issue.

Hide People module (v1.1)

  • Removes “Who Is Online” and “People On This Project” blocks from dashboards.

Tickets Plus module (v1.5.5)

  • Fixed: Send email notification twice on ticket completion
  • Fixed: Attachments are not visible for tickets created using Public Submit
  • Fixed: UI fix for filter drop downs in Tickets list

Time Reports Plus module (v1.3.3)

  • Fixed: Time records not grouped correctly by billing status (Billable, Non Billable, Billed etc.)
  • Fixed: Increased memory limits while generating time reports

Enjoy!

]]>
https://www.appsmagnet.com/updates-for-five-products-available-gravatar-incremental-backup-hide-people-tickets-plus-and-time-reports-plus/feed/ 0
All our products are activeCollab 2.3.4 compatible now https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-4-compatible-now/ https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-4-compatible-now/#comments Fri, 19 Aug 2011 12:54:01 +0000 https://www.appsmagnet.com/?p=1578 Wanted to let everyone know that all our products are now compatible with activeCollab 2.3.4.

We updated four products for compatibility, the others will work without a change.

Products we’ve updated:

  • Planning Module (version 1.7.3)
  • Tickets Plus Module (version 1.5.3 – this also adds useful new features)
  • Confidential Items Module (version 1.3.2)
  • acHack – Gravatar (version 1.3.1)

All other products are already compatible with activeCollab 2.3.4

Customers can download these updates from our members area.

Release Notes

Planning Module v1.7.3

  • activeCollab v2.3.4 compatibility version
  • Items created by people who can’t see private objects will be normal now

Tickets Plus Module v1.5.3

Enhancements:

  • activeCollab v2.3.4 compatibility added
  • Can now filter tickets based on user – creator, assignee, responsible. (thanks to Dale Daguro of mercola.com for sponsoring initial work on this)
  • Quickly update status and responsible person while adding a comment
  • Now you can set the default sorting option for tickets list (thanks for your suggestion Damien)

Fixes:

  • Status update notification email no longer goes to user who’s making the change
  • Even if workflow status was not changed during an edit operation, it was showing in Recent Activities. Fixed.

Confidential Items Module v1.3.2

  • activeCollab v2.3.4 compatibility version

acHack – Gravatar v1.3.1

  • activeCollab v2.3.4 compatibility version

Enjoy!

]]>
https://www.appsmagnet.com/all-our-products-are-activecollab-2-3-4-compatible-now/feed/ 0
Product Updates – Planning, Reports and Time Reports Plus https://www.appsmagnet.com/product-updates-planning-reports-and-time-reports-plus/ https://www.appsmagnet.com/product-updates-planning-reports-and-time-reports-plus/#comments Fri, 22 Jul 2011 08:54:54 +0000 https://www.appsmagnet.com/?p=1567 Today, we released minor updates to Planning, Reports and Time Reports Plus modules.

Here’s what has changed:

Planning Module

Fixed the unrecognized tag item_priority issue in printing the plan.

Reports Module

Will install even if Tickets Master Categories don’t exist.

Time Reports Plus Module

  • Fixed Mass update required page reload to come back to Time Reports Plus
  • Fix for incorrect user / project URL in time records

As usual, you can download these updates from our members area.

]]>
https://www.appsmagnet.com/product-updates-planning-reports-and-time-reports-plus/feed/ 0
Communications Module 1.3 Released – fixes and top requested feature https://www.appsmagnet.com/communications-module-1-3-released-fixes-and-top-requested-feature/ https://www.appsmagnet.com/communications-module-1-3-released-fixes-and-top-requested-feature/#comments Mon, 23 May 2011 09:27:19 +0000 https://www.appsmagnet.com/?p=1490 Our popular Communications module for activeCollab now reaches version 1.3.

This is a minor release overall, but important one as well. Here’s what has changed.

Enhancements:

You can now set interval between two items in dashboard carousel from admin. Default is 2.5 seconds, but you can change that to anything that suits you. This was our top requested feature and we are glad we have it for you now!

Fixed:

  • New Message notifications not working in some browsers. Fixed.
  • Quickly pressing enter twice when sending new message duplicated it. Fixed.
  • Some items visible to people who do not have access to them. Fixed.
]]>
https://www.appsmagnet.com/communications-module-1-3-released-fixes-and-top-requested-feature/feed/ 0
Tickets Plus 1.5.2 – translate workflow status names, solution for visibility issue https://www.appsmagnet.com/tickets-plus-1-5-2-translate-workflow-status-names-solution-for-visibility-issue/ https://www.appsmagnet.com/tickets-plus-1-5-2-translate-workflow-status-names-solution-for-visibility-issue/#comments Mon, 23 May 2011 09:23:02 +0000 https://www.appsmagnet.com/?p=1488 We updated Tickets Plus Module to v1.5.2. This is a minor enhancements and bug fix release.

Enhancement:

You can now localize Workflow status names. Using activeCollab Languages feature, you can fully translate workflow status names to any language you want.

Fix:

Visibility option was showing to people who can’t see private objects. Removed it.

]]>
https://www.appsmagnet.com/tickets-plus-1-5-2-translate-workflow-status-names-solution-for-visibility-issue/feed/ 0
Minor update to Reports Module – fixes a localization issue https://www.appsmagnet.com/minor-update-to-reports-module-fixes-a-localization-issue/ https://www.appsmagnet.com/minor-update-to-reports-module-fixes-a-localization-issue/#comments Mon, 23 May 2011 09:19:19 +0000 https://www.appsmagnet.com/?p=1463 We just released Reports Module 1.8.1. This fixes an issue with Recent Activity list not showing in People reports when you are using a non-English language with activeCollab.

Suggested upgrade for people you use multiple languages with activeCollab.

]]>
https://www.appsmagnet.com/minor-update-to-reports-module-fixes-a-localization-issue/feed/ 0
PlannerX v2.0 goes live – adds estimates, start dates and foundation for future https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/ https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/#comments Sat, 06 Mar 2010 11:21:44 +0000 https://www.appsmagnet.com/?p=813 We launched PlannerX v2.0 today. This release adds estimates, start dates and due dates with all project plan items – Milestones, Todo lists and Todos. Gantt charts work much more reliably now and we have included numerous other functionality, performance and usability enhancements. This is the biggest upgrade after our initial launch about a year ago.

The new version helps you plan your Basecamp projects even faster. Here are some highlights.

Smart Estimates

Smart Estimates

Smart Estimates

Finally you can add estimates for your milestones, todo lists and todo items. Estimates total up automatically, and show up in an easy to understand format. Some examples of estimate’s smartness:

  • 2 becomes 2h
  • 8 becomes 1d
  • 5d becomes 1w
  • 160h becomes 1m
  • 170h becomes 1m 1d 2h
  • Adding estimate for Todo updates estimate for Todo list and Milestone too
  • Totaling up updates parent’s estimate only if parent’s current estimate is lower than sum of children
  • And there is even an estimate slider in Card view and Batch Update
  • You can configure estimate conversion calculations from your account settings

We don’t compare Estimates with Actual Time yet. That’s reserved for another release!

Start and Due Dates

Smart Dates

Start & Due Dates

Basecamp added Due Dates to todo items a while ago (this was the most demanded feature from Basecamp!) PlannerX allows you to add due dates for Todo lists and Start dates for all items. We listened you and have added a date picker. At the same time, we have made it easier to enter dates with auto completion. Enter “6” in a date field in Outline view, and it will automatically convert it to “3/6/10″ (6th March, assuming you are using MM/DD/YY format – configurable from your account settings). We believe you will love it!

Intelligent Batch Update

So far, you could update the assignee name using Batch Update. You can now update estimates and dates as well. Here are some cases on how Batch Update can come in handy.

Batch Update

Batch Update

  • You have done your initial estimation. But now need to pad them before submitting to management. Just select all items you want to update, click on Batch Update (or Ctrl + . on keyboard). Then Add 25% to Estimates. PlannerX will automatically do all the calculations.
  • Someone left your team and you now need to reassign her tasks to a new hire. Select appropriate items and select the new hire’s name from the Assignee drop down Batch Update.
  • Your project is delayed. It’s running about two weeks late and you need to update all start / due dates. This would be a nightmare, but with PlannerX, you can just select these items, go to Batch Update. And add 2 weeks to start and due dates. Save back and you are done!
  • Completed a lot of items? Select them all and complete them in one go with Batch Update!

We expect Batch Update will save you a lot of time. It’s especially useful on dynamic (read delayed, troubled, messy – or just about any) projects.

Everything Saved back to your Basecamp

We store estimates, start dates and due dates (for Todo lists) with item names in Basecamp. This way you and all other people on your project can see them. You can edit estimates and dates in Basecamp too, and they will be imported to PlannerX. You could even use any other tool to update / manage this information. This is the best compromise between usefulness and readability. We hope you like it.

Gantt Charts that work

We know you love our Gantt charts. We have made them more reliable now. Many customers complained Gantt charts were not working. We have revamped the whole logic and they work much better now. You can even print big charts spanning multiple pages now! They are not editable (we are not sure if we want to add that complexity yet), but super useful even in the current state.

Same Efficiency, and even better

PlannerX is known for its efficiency. Especially how it allows you to manage your project plan quickly. We have retained all those bits and added some more. You can continue using keyboard to navigate and create new items. We have improved keyboard navigation and even added a “text import” feature that lets you type in a plan just as you would in Notepad. PlannerX will automatically convert it to Milestones, Todo lists and Todo items. We have also solved some annoyances (like “Remember Me” not always working) to make your experience more enjoyable.

Text Import

More coming soon

There are numerous enhancements and bug fixes in this release. But apart from that, it is a significant upgrade to our core. This release also brings PlannerX almost on par with our Planning Module for activeCollab.We will release few more upgrades over the next few weeks. Here are two items on our list:

We plan to continue improving PlannerX and look forward to your feedback.

Thank you!

Nirav Mehta for the Apps Magnet Team

]]>
https://www.appsmagnet.com/plannerx-v2-0-goes-live-adds-estimates-start-dates-and-foundation-for-future/feed/ 8
Upgrading Reports Module for activeCollab https://www.appsmagnet.com/upgrading-reports-module-for-activecollab/ https://www.appsmagnet.com/upgrading-reports-module-for-activecollab/#comments Fri, 29 May 2009 04:34:01 +0000 https://www.appsmagnet.com/?p=231 How do you upgrade Reports Module for activeCollab?

Here are the basic steps in upgrading Reports Module for activeCollab.

  1. Ensure you have the latest version of Reports module.
  2. Unzip the module on your computer. You should see a folder named “for-upload”.
  3. Go to your activeCollab installation website. Go to administration panel.
  4. Click on “Modules”, then “Reports Module”.
  5. Click “Uninstall” to remove the current version of Reports Module.
  6. Upload files from the “for-upload” folder to your server via FTP / SCP. Overwrite existing Reports module files in activecollab/application/modules/reports/ and public/assets/modules/reports/ folders. Make sure you upload files to the right locations and are not overwriting any folders other than the two above.
  7. Go back to activeCollab administration screen -> Modules -> Reports Module.
  8. Click “Install”. This will taken a snapshot of your data again and set up the Reports module.
  9. Confirm that “can_use_reports” permission is enabled on appropriate System Roles as you need.
  10. Upgrade is complete! You can now enjoy the fresh new Reports module!
]]>
https://www.appsmagnet.com/upgrading-reports-module-for-activecollab/feed/ 0
Reports Module v1.2 – Compatible with aC 2, Printing, Localization and more https://www.appsmagnet.com/reports-module-v12-compatible-with-ac-2-printing-localization-and-more/ https://www.appsmagnet.com/reports-module-v12-compatible-with-ac-2-printing-localization-and-more/#comments Wed, 04 Mar 2009 12:37:33 +0000 https://www.appsmagnet.com/?p=117 We just released the latest, 1.2 version of Reports Module.

Icons in v1.2 main bar

Icons in v1.2 main bar


Here are some feature additions:

  • Works with activeCollab 1.1+ as well as activeCollab 2.0+
  • You can now print Reports!
  • Added localization support – you can now translate Reports interface in your own language
  • UI and performance enhancements – icons, negative value support, date format etc!
You can now print your reports

You can now print your reports

Buy Now

This upgrade addresses most of the feature requests we received and bugs discovered. If you are an existing customer, you should have got your free upgrade by now.

If you are not a customer yet, buy it now. It’s only $39!

]]>
https://www.appsmagnet.com/reports-module-v12-compatible-with-ac-2-printing-localization-and-more/feed/ 0